Handy tools
Field work rate calculator
How long will that paddock take? Turn your machine's width and speed into hectares an hour - then the hours, days, fuel and cost for the job.
Your machine covers
12hectares an hour
29.7acres an hour
16 h 40 minfor 200 ha
- Working days
- 1 full day + 6 h 40 min (1.7 days)
- With no turns or stops
- 12 ha/h
- Time lost to turns and stops
- None allowed for
- Fuel for the job
- Enter your own L/h
- Cost at your rate
- Enter your own $/hour
How we work it out
- Hectares an hour: width (m) × speed (km/h) ÷ 10. So a 12 m boom at 10 km/h covers 12 ha an hour with no stops.
- Field efficiency: your own % of the time actually working - turns, overlap, filling and stops take the rest. 80% turns 12 ha/h into 9.6 ha/h.
- Hours and days: area ÷ hectares an hour, then divided by the hours you work a day. Fuel and cost are your own figures × those hours.
Real work rates change with the paddock shape, ground, weather and how far you travel to fill up - use your own records when you have them. This is arithmetic on your own numbers, not a machine figure, a contract rate or advice. Nothing you type is stored or sent anywhere.